By Halcyon Machinery · Factory-direct from our Xiamen production base · Published ·
Direct answer
When you compare purlin machines for sale, decide three things in this order: the C and Z sections you must produce (web, flange, lip, thickness and steel grade), the line level (fixed-size, quick-change or fully automatic stepless C/Z), and the trial you will accept before shipment. A C/Z purlin roll forming machine is tooled to those drawings, so two listings with the same name can make different purlins. Send your C and Z drawings with thickness range and target output and we reply with a written quotation within 24 hours.
Price range: C/Z purlin roll forming machines
US$39,000–62,000 (standard) · US$72,000–143,000 (premium), FOB China
Standard covers the first two configuration levels (single-profile and multi-profile / quick-change); premium covers fully automatic lines.
Final price depends on profile, thickness, speed, punching and automation. Excludes freight, import duties and installation. Send your profile drawing for a quotation within 24 hours. North American configurations (480V/60Hz, UL and local requirements) are quoted separately.
Large complete lines (e.g. truck chassis beam lines or full cable tray lines) are quoted per project, typically above US$150,000.
Manufactured in our Xiamen factory · 35+ years of roll forming experience.
Get a quote for this machine
Send your profile drawing or a photo of the profile. We reply within 24 hours with a configuration and price.
Commercial terms
- Lead time
- standard machines 30–60 days; automatic and heavy-duty lines 60–120 days (confirmed in the quotation).
- Warranty
- 12 months on the machine, lifetime technical support by video and remote guidance; wear parts excluded.
- Payment
- 30% deposit; 70% before shipment, after you approve the trial-run video.
- Shipping
- FOB Xiamen, China.

Step 1: choose the line level, not just the machine name
Most purlin machine listings fall into two configuration levels. The level decides how many sizes you can make, how long a size change takes and how much the line costs.
| Configuration level | What it does | Usually chosen for |
|---|---|---|
| Basic fixed-size C or Z line | One section size per tooling set; size change means changing spacers or rolls | One or two standard purlin sizes in steady demand |
| Quick-change C/Z line | C and Z from one line with faster manual or semi-automatic size adjustment | Steel-building suppliers with several regular sizes |
| Fully automatic stepless C/Z line | Web and flange sizes set by PLC recipe, C/Z conversion, pre-punching and cutting | Project work with many sizes and hole patterns; see N-series stepless C/Z |
Quotation for your purlin sizes within 24 hours
Send your C and Z section drawings, thickness range and target output. Our factory engineers in Xiamen reply with a written, itemized quotation.
Step 2: check the documented size ranges
These are the documented reference ranges of the automatic C/Z models built at our Xiamen production base. Each model is reviewed separately; the largest web, thickness and speed values cannot be combined into one machine.
| Model | C section web | Z section web | Thickness | Reference speed, m/min | Main drive |
|---|---|---|---|---|---|
| HCZ-S20-300 | C/U 75–300 mm | Z 120–300 mm | 1.0–3.0 mm | 30 | 22 kW |
| HCZ-300L | C 80–300 mm | Z 120–300 mm | 1.0–3.0 mm | 32 (12–18*) | Servo |
| HCZ-350A | C 80–350 mm | Z 120–350 mm | 1.0–3.5 mm | 36 | 42 kW servo |
| HCZ-400A | C/U 100–400 mm | Z 120–400 mm | 1.5–4.0 mm | 36 | 52 kW servo |
Source: our Xiamen production base's C/Z model-family comparison and HCZ-300L technical sheet, reviewed 28 September 2026. *HCZ-300L typical speed with punching. Speed with punching depends on hole quantity and spacing; final values are confirmed against your drawing in the quotation.

Step 3: buy it in six checks
| Check | What to do | What you should receive |
|---|---|---|
| 1. Section drawings | Dimension every C and Z size: web, flange, lip, thickness, steel grade | Signed drawings for each size |
| 2. Holes and cutting | Mark hole patterns, slots and cut lengths; decide pre-punch or post-cut | Punching and cutting route in the offer |
| 3. Line level | Fixed-size, quick-change or fully automatic stepless | List of included stations and controls |
| 4. Itemized quotation | Decoiler, leveller, punching, forming, cutter, run-out, spares, FOB or CIF | Quotations compared on the same basis |
| 5. Trial before shipment | Run your sizes with coil of the stated thickness; measure web, flange and holes | Trial video and measured sample pieces |
| 6. Packing and start-up | Container loading, rust protection, video commissioning or engineer visit | Manual, electrical drawings, parts list |

New factory-direct line or a used purlin machine for sale?
A used purlin machine only makes the sizes and hole patterns its tooling was built for, and its shafts, hydraulics and electrics are of unknown condition. A new line is tooled to your drawings, built for your voltage and trialled with your coil. If you look at a used machine, ask for a running video and measure a sample piece against your drawing before paying.
What affects the price
We quote by configuration, not from a price list. The price changes with the section size range, thickness and steel grade, the number of hole rows and the punching method, pre-cut or post-cut, the level of automation (fixed-size, quick-change or stepless), stacking, the control-system brands and the delivery terms (FOB or CIF). For the import steps, read how to import a roll forming machine from China.
Send your purlin drawings — quotation within 24 hours
Drawings, thickness range, steel grade, hole pattern and target output are enough for a first written quotation.
Video: what to check on every cut piece
A short Halcyon video on the checks to make on each cut Z purlin piece.
Buyer questions
Should I buy a C purlin machine, a Z purlin machine or a C/Z machine?
Buy for the sections your projects use. If you only supply C sections, a C line is simpler. If your roofs and walls use lapped Z purlins over continuous spans, or customers ask for both, a C/Z line avoids a second machine. Send both drawings and we confirm what one line can cover.
How much does a purlin machine cost?
We quote by configuration. Section range, thickness, punching, cutting, automation level, control brands and FOB or CIF terms change the price. Send your drawings and we reply with a written quotation within 24 hours.
How long does a size change take?
It depends on the line level. A fixed-size line needs a tooling change; a fully automatic stepless line changes web and flange size by PLC recipe. Ask for the changeover to be shown in the trial video for your sizes.
Can the machine punch holes for bolting?
Yes, when the punching station is included in the quoted configuration. Mark the hole pattern on the drawing so the punching dies and positions are reviewed before the quotation.
What do I need to send for a quotation?
C and Z section drawings for each size, steel grade, thickness range, hole pattern, cut lengths, target output, voltage and destination port.
What to send for a quotation
Section drawings, steel grade, thickness range, hole patterns, cut lengths, target output, voltage and destination port. See reference projects from our Xiamen production base.
Get a purlin machine quotation in 24 hours
Factory-direct from our Xiamen production base. Send your drawings through the form or on WhatsApp.
Related guides
Purlin roll forming machine · C purlin machine · Z purlin machine · C purlin vs Z purlin
Sources: Halcyon product pages and buyer guides; our Xiamen production base's technical documents and published photographs; workshop photograph from our Xiamen production base; reviewed 9 October 2026. Prices are not published.