Use one copy per proposal. Compare the same approved wall-sheet drawing and trial basis; mark unknown scope or cost pending.
| Requirement | Confirmed scope, reference or pending item |
|---|---|
| Proposal reference, date and supplier | |
| Wall drawing identifier and revision | |
| Material, coating, thickness and visible face | |
| Overall/effective cover and edge/fixing detail | |
| Rolls, cutter, changeover and tooling scope | |
| Included, optional and excluded modules | |
| Film, sheet handling and stack-contact protection | |
| Packing and handling exclusions | |
| Trial pieces, joint fit and agreed acceptance criteria | |
| Accepted batch output and trial conditions | |
| Currency, named delivery place and pending destination costs | |
| Installation, training, manuals, spares and service exclusions |
Blank buyer worksheet. Not a quotation, agreed price, compatibility statement or completed acceptance report. Insulated-panel production and finished-wall performance require separate scope and evidence.
Return to wall-cladding equipment checks · Halcyon Machinery · 5 October 2026